I rolled out some DAS pieces and cut them to length, then with plenty of water I pressed them into place shaping and marking them as I went. I did the main four each side and then a 5th one from the top one just under the chin and then almost to the top of… Read more »
Posts Tagged: ribs
Build Stages
- Materials 21/09/2013
- Final thoughts 02/09/2012
- Done !!! 28/08/2012
- My son, the web designer 12/08/2012
- This ‘n That 02/08/2012
- Final scope detail. 30/07/2012
- Back again. 28/07/2012
- Odds and sods 10/07/2012
- Yet more scope detail. 30/06/2012
- Getting a facelift. 20/06/2012
- Scope and front detail. 29/05/2012
- Scope rear. 25/05/2012
- Scope body. 21/04/2012
- Scope Front 21/07/2011
- Seat Ribbing 22/06/2011
- Sides and Infills 21/06/2011
- Back up 21/11/2010
- Boney 21/10/2010
- Scope support 16/10/2010
- Seat and Base 16/09/2010
- Hands take control 16/08/2010
- Lending a hand 16/07/2010
- Spare Ribs 16/06/2010
- Arms and Body Meat 16/05/2010
- Armed but not dangerous 17/04/2010
- It starts… 16/04/2010