Final scope detail.

A slab of das was added to the scope front and 14 half round balls were bedded into it whilst still wet. When it all dried they were removed and fitted again with spots of superglue. Side support bars had tops added from small pieces of shaped das. Holes at the top of the scope main support body were drilled to allow main scope body to be removable.jockey38

Leave a Reply

Your email address will not be published. Required fields are marked *